The concrete saw uses cooling water diamond saw blades to drill holes and
dismantle the concrete. The construction speed is faster, the noise is low, and
the price is high. The following are the operating steps of the concrete saw
Before starting the concrete saw,check whether the motor and cable are
normal,whether the saw blade meets the regulations, and whether the installation
is proper.
After the concrete saw is started, run it at full load first, check the saw
blade rotation position, whether the elevator is flexible, and whether the
operation is abnormal, and then it can be used after it is normal. The laser
cutting thickness should not exceed the original requirements of the
equipment.
When the concrete saw is working, if there is an abnormal sound, it should
be shut down immediately for inspection. After the fault is detected, it can
work again.
After the construction of the concrete saw, clean the shell, wipe the saw
blade, drain the remaining water in the water storage tank, retrieve the cable,
and store it in a dry and cool place.
Rosit is a leader in the global power tool service market. We take
electric, pneumatic and hydraulic drive technology as the core. Our product
categories mainly include hand tools, instruments, workshop equipment and fixed
tools, labor protection products, industrial equipment,chemicals and so on.
At the same time, we provide customers with a series of system solutions
and communication channels to help customers improve procurement, inventory,
logistics and management costs.
Through continuous R&D and innovation, the Rosit team improves the
safety, efficiency and comfort of products gradually, and aims to provide
customers with better quality industrial-grade tools, mature system solutions
and services,so as to improve work efficiency and production capacity greatly,
and create greater value for customers and partners.
Read recommendations:
AN22-6000 Pneumatic Torque Wrench (straight shaft)
CC21-380 Pneumatic Chainsaw (3.0 kw Series)
Alloy Saw Blades
Alloy Guide Bars丨CC814 Series
Selection elements of high-pressure vortex air pump